Iowa ABC Connections

Thumbnail Image
Date
2015-06-01
Authors
Dahlberg, Justin
Phares, Brent
Major Professor
Advisor
Committee Member
Journal Title
Journal ISSN
Volume Title
Publisher
Authors
Research Projects
Organizational Units
Organizational Unit
Institute for Transportation
InTrans administers 14 centers and programs, and several other distinct research specialties, and a variety of technology transfer and professional education initiatives. More than 100 Iowa State University faculty and staff work at InTrans, and from 200 to 250 student assistants from several ISU departments conduct research while working closely with university faculty. InTrans began in 1983 as a technical assistance program for Iowa’s rural transportation agencies.
Journal Issue
Is Version Of
Versions
Series
Department
Institute for Transportation
Abstract

For several years the Iowa Department of Transportation (DOT), Iowa State University, the Federal Highway Administration, and several Iowa counties have been working to develop accelerated bridge construction (ABC) concepts, details, and processes. Throughout this development, much has been learned and has resulted in Iowa being viewed as a national leader in the area of ABC. However, at this time, the Office of Bridges and Structures does not have a complete set of working standards nor design examples to accompany ABC portions of the bridge design manual (now called the Load and Resistance Factor Design/LRFD Bridge Design Manual). During the fall of 2013, the Iowa DOT constructed a bridge on IA 92 in Cass County using an ABC technique known as slide-in bridge construction. During the design of the Cass County Bridge, several questions were raised about the performance of critical design and construction details: the pile-to-pile cap connection and the polytetrafluoroethylene (PTFE) coated bearing pads on which the bridge would slide. The timing of this specific need and the initiation of this project offered a unique opportunity to provide significant short- and long-term value to the Office of Bridges and Structures. Several full-scale laboratory tests, which included several variations of the pile-to-pile cap connection and bearing pad slides, were completed. These tests proved that the connection was capable of achieving the desired capacity and that the expected coefficient of friction of the bearing pads was reasonably low. Finally, a design tool was developed for the Office of Bridges and Structures to be used on future projects that might benefit from a precast pile cap.