Abstract
This paper discusses the components of a guaranteed maximum price (GMP) and proposes a framework for the development of GMPs as contract payment provisions for construction manager-at-risk (CMR) and design-build (DB) contracts for transportation projects. The framework is the synthesis of a comprehensive literature review, a content analysis of CMR and DB solicitation documents and contracts, and case study project output from twelve projects in nine states worth $3.1 billion. The research also discusses the development of three common types of contingencies that are often utilized in projects with GMPs. The study concludes that owners should specify the structure of the GMP and its components to enhance clarity and understanding of the GMP’s composition. It recommends that this structure be included in the CMR and DB solicitation documents so that pricing proposals can be formulated in a manner that is consistent with the contract payment provisions that will be useful to practitioners that need to implement GMP-based contracts.
Research Focus Area
Construction Engineering and Management
Copyright Owner
KICEM
Copyright Date
2011
Language
en
File Format
application/pdf
Recommended Citation
Gransberg, Douglas D.; Shane, Jennifer S.; and Ahn, Junyong, "A Framework for Guaranteed Maximum Price and Contingency Development for Integrated Delivery of Transportation Projects" (2011). Civil, Construction and Environmental Engineering Publications. 19.
https://lib.dr.iastate.edu/ccee_pubs/19
Comments
This article is from Journal of Construction Engineering and Project Management 1 (2011): 1–10, doi:10.6106/JCEPM.2011.1.1.001. Posted with permission.