Campus Units

Economics

Document Type

Article

Publication Version

Published Version

Publication Date

9-2017

Journal or Book Title

Energy Economics

Volume

67

First Page or Article ID Number

300

Last Page

314

DOI

10.1016/j.eneco.2017.08.023

Abstract

The U.S. cellulosic biofuel mandate has not been enforced in recent years. Uncertainty surrounding the enforcement of the mandate in addition to high production and harvest cost have contributed to a delay in the widespread planting of bioenergy crops such as switchgrass and miscanthus. Previous literature has shown that under uncertainty and sunk cost, an investment threshold is further increased due to the value associated from holding the investment option. In this paper, we extend the previous literature by applying a real option switching model to bioenergy crop production. First, we calculate the county-level break-even price which triggers a switching away from traditional field crops (corn, soybeans, and wheat) to bioenergy crops under various scenarios differing by commodity prices, production cost and biomass price expectations. We show that the resulting break-even prices at the county-level can be substantially higher than previously estimated due to the inclusion of the option value. In a second step, we identify counties that are most likely to grow switchgrass or miscanthus by simulating a stochastic biomass price over time. Our results highlight two issues: First, switchgrass or miscanthus are not grown in the Midwest under any scenario. Under low agricultural residue removal rates, biomass crops are mostly grown in the Southeast. Second, under the assumption of a high removal rates, bioenergy crops are not grown anywhere in the U.S. since the cellulosic biofuel mandate can be covered by agricultural residues.

JEL Classification

C15, C18, C63

Comments

This article is published as Dumortier, Jerome, Nathan Kauffman, and Dermot J. Hayes. "Production and spatial distribution of switchgrass and miscanthus in the United States under uncertainty and sunk cost." Energy Economics 67 (2017): 300-314. doi: 10.1016/j.eneco.2017.08.023.

Rights

Works produced by employees of the U.S. Government as part of their official duties are not copyrighted within the U.S. The content of this document is not copyrighted.

Language

en

File Format

application/pdf

Working Paper

Share

COinS