Developing a Simple and Rapid Test for Monitoring the Heat Evolution of Concrete Mixtures for Both Laboratory and Field Applications

Thumbnail Image
Date
2007-01-01
Authors
Ge, Zhi
Grove, Jim
Ruiz, J.
Rasmussen, Rob
Ferragut, Ted
Major Professor
Advisor
Committee Member
Journal Title
Journal ISSN
Volume Title
Publisher
Authors
Person
Wang, Kejin
Professor
Research Projects
Organizational Units
Organizational Unit
Institute for Transportation
InTrans administers 14 centers and programs, and several other distinct research specialties, and a variety of technology transfer and professional education initiatives. More than 100 Iowa State University faculty and staff work at InTrans, and from 200 to 250 student assistants from several ISU departments conduct research while working closely with university faculty. InTrans began in 1983 as a technical assistance program for Iowa’s rural transportation agencies.
Journal Issue
Is Version Of
Versions
Series
Department
Institute for Transportation
Abstract

Recently, activities and interest in monitoring the heat evolution of cement hydration in concrete have increased. This is because the development of early-age concrete properties (such as workability, setting time, strength gain, and thermal cracking resistance) is predominantly influenced by the kinetics of cement hydration. Various test methods are currently available for measuring heat of cement hydration; however, most existing methods require expensive equipment, complex testing procedures, and/or extensive time, thus making them unsuitable for field application. Although ASTM C 186 is used for determining the heat of hydration of cement, there is no standard test method for concrete. The overall object of this three-phase study is to identify, develop, and evaluate a standard test procedure for monitoring pavement concrete using a calorimetry technique. It is envisioned that the newly developed calorimetry test method will be able to verify appropriate concrete proportions, to identify potentially incompatible materials and conditions, and to predict concrete performance. The primary objective of Phase II (presented in this report) is to establish a standard test procedure as well as the methods for interpreting the calorimeter test results. The newly developed calorimeter test is completed more quickly than ASTM C 186, in approximately 24 hours. Among a number of uses, the test can be utilized as a quality control measure for prescreening concrete materials and a prediction tool for early-age cracking. The Phase II results demonstrate that the new calorimetry test method has a high potential for detecting concrete incompatibility problems, predicting fresh concrete properties (such as set time), and assessing hardened concrete performance characteristics (such as strength gain and thermal cracking).

Comments

For more on this project and other project reports from InTrans, please visit http://www.intrans.iastate.edu

Description
Keywords
Citation
DOI
Source
Subject Categories
Copyright
Collections