This paper investigates the use of guided waves to inspect the embedded tendons in post- tensioned bridges. The unexpected collapse of the Ynys-y-Gwas bridge in South Wales[1] has highlighted the need for an inexpensive, reliable inspection method for testing the thousands of existing post-tensioned bridges. Post-tensioned construction allows large spans to be constructed with a light, inexpensive design. Figure 1 summarizes the technique, which involves constructing the framework of the bridge out of concrete, leaving metal or plastic tubes called ducts at predetermined locations. Steel bars or multi-wire strands (collectively referred to as tendons) are threaded through the ducts once the concrete has hardened. The steel tendons are tensioned and anchored by small collets at their ends. The tensioned steel forces the concrete into compression so that is better able to support the required loads. Once the steel is tensioned, the ducts are filled with grout to provide corrosion protection. However, large air voids can be trapped in the grout, providing areas for corrosion to occur, which could lead to catastrophic failure such as the Ynys-y- Gwas collapse. The current inspection techniques have not proven to be entirely satisfactory [2], especially for inspecting the portion of the tendon near the anchorages, which is a location where the tendon is particularly prone to corrosion.

Book Title

Review of Progress in Quantitative Nondestructive Evaluation

Volume

17B

Chapter

Chapter 6: Materials Characterization

Section

Construction Materials

Pages

1557-1564

DOI

10.1007/978-1-4615-5339-7_202

Language

en

File Format

application/pdf

Share

COinS
 
Jan 1st, 12:00 AM

Guided Ultrasonic Waves for the Inspection of Post-Tensioned Bridges

La Jolla, CA

This paper investigates the use of guided waves to inspect the embedded tendons in post- tensioned bridges. The unexpected collapse of the Ynys-y-Gwas bridge in South Wales[1] has highlighted the need for an inexpensive, reliable inspection method for testing the thousands of existing post-tensioned bridges. Post-tensioned construction allows large spans to be constructed with a light, inexpensive design. Figure 1 summarizes the technique, which involves constructing the framework of the bridge out of concrete, leaving metal or plastic tubes called ducts at predetermined locations. Steel bars or multi-wire strands (collectively referred to as tendons) are threaded through the ducts once the concrete has hardened. The steel tendons are tensioned and anchored by small collets at their ends. The tensioned steel forces the concrete into compression so that is better able to support the required loads. Once the steel is tensioned, the ducts are filled with grout to provide corrosion protection. However, large air voids can be trapped in the grout, providing areas for corrosion to occur, which could lead to catastrophic failure such as the Ynys-y- Gwas collapse. The current inspection techniques have not proven to be entirely satisfactory [2], especially for inspecting the portion of the tendon near the anchorages, which is a location where the tendon is particularly prone to corrosion.